Hi,
I'm looking to change my line rental and broadband from Sky to O2 and they're telling me that I'll need to pay a reconnection fee to take the line back onto the BT network.
The problem with that is that an engineer apparently needs to visit my property (to do what??) which they can't schedule in until Dec 17th.
Is there really nothing I can do to speed that up. Surely the switchover at the exchange can be done before then?
I'm looking to change my line rental and broadband from Sky to O2 and they're telling me that I'll need to pay a reconnection fee to take the line back onto the BT network.
The problem with that is that an engineer apparently needs to visit my property (to do what??) which they can't schedule in until Dec 17th.
Is there really nothing I can do to speed that up. Surely the switchover at the exchange can be done before then?